Prologue – Apparal house, an exhibition cum convention centre had years of carpet. the floor underneath had started to get damaged and hence was creating lots of problems
Objective – since the exhibition hall was mostly booked finding time line for such a project was very difficult. also cost effective and time bound solution was needed. tiles were not an option as they crack – thanks to installation of stalls.
remedy – after much consideration about costs and time line, they chose to give polished concrete at chance. one of the first projects for Klindex India
process
The EPICENTRE, APPARAL HOUSE, Gurgaon The coloring Proces
results
![](http://klindex.in/wp-content/uploads/2020/04/D-7-1024x768.jpg)